#More. C. All matters that need to be kept in C (R.C.C.) work

More. C. C (R.C.C) work
   
Construction is no longer C. C. (R.C.C.)
What? We all know that.
But no. C. Important aspects of the work of C (R.C.C.) How many do we know or how many things we keep?
A slight negligence can happen due to the accident and the death may be due to many deaths and lots of
Waste of money
And look at that and again. C. The topics covered in the C. R.C.C are as follows:
→ Road:
→ Structural Designs Required
Whether it is rugged accordingly
To verify it,
→ Whether the leg layout is straight
Take a look at it,
→ The thickness of the band or the dia is okay
Whether to check it out,
→ The gap between the rope is correct
Seeing whether there is,
Essentially the mean of # three gaps
It needs to be sorted by size,
→ Gate between traces or distance must be at least 1 "
→ Give the right size hook and bendi
To verify whether it has been done,
Take a look at the laping distance on the road,
→ Blocking each GI wire
To be verified,
→ See the thickness of used blocks 1: 1 (sand: cement)
Will take,
→ any kind of rust or crack
Can not be
→ Doing Job:
→ To see if all the goods and equipment are appropriate,
→ Required number of labours
The goal of whether the mistry is in stock
Keep,
→ presence of vibration operator
And check whether the vibration machine is on,
If you have to work at night then
Maintaining adequate lighting,
Note that the use of any kind of consul pipe is excluded,
→ All kinds of dirt, rubbish and dust-cleaning,
→ All types of work repair
Whether the mistry is there.
→ Satering or Formwork:
→ Checking the alteration of the catering,
→ Whether the seater's material is cleaned,
→ Steel sourcing on the bottom of it
Whether the oil has been used and wooden cleaning, if any type of hole or floor is equal and smooth
Whether there is
→ no holes with the sewerage hole
Whether the type of water is coming out
Test,
→ Shutting the Sitter while working
If it does not go away or break, it is better to check whether the support of the sutarera has been given exactly as before,
→ Thin tin ribbons or wooded cloth jute shutters need to be closed and foam or jute tape should be used in the joint of the steel shutter joints.
→ during welding:
→ The cylinder should be three,
→ There will be two mechanists ready to fix the seating at the time of welding,
→ Concrete molding over 5 feet
Not good to do,
→ Vibrate right,
→ Finishing of the concrete level and the surface must be parallel.
→ Worth the following:
→ Quring well timely
Make,
→ Scheduled time according to the right rules
After the shutter is open,
If the concrete value is appropriate in the test
If it does not come, then the structure should be broken and renewed again

Rimonkhan471

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation.

0 comments:

Post a Comment

CONCRETE CURING COMPOUND

SCOPE OF WORK Application of curing compound onto fresh concrete surface GENERAL PURPOSE OF CURING COMPOUNDS FOR FRESH CONCRETE • ...

 

Copyright @ 2015