** Concrete is always kept wet for some time from the day after the cast, it is called curing.
After 6 to 24 hours of concrete molding, we need to do the curring.
**** Good Courting Results: -
1. Increase resistance to resistance and increase weather resistance quality.
2. Increases the strength of the concrete and stability.
3. Reduce recurrence trend
4.Abrasion resistant power increases.
5. Incandescent power increases.
**** Curling Method: -
1.Customer
2. The surface covered the land.
3. Sprinkle water
4.Highly made.
5. Creates wetland.
After 6 to 24 hours of concrete molding, we need to do the curring.
**** Good Courting Results: -
1. Increase resistance to resistance and increase weather resistance quality.
2. Increases the strength of the concrete and stability.
3. Reduce recurrence trend
4.Abrasion resistant power increases.
5. Incandescent power increases.
**** Curling Method: -
1.Customer
2. The surface covered the land.
3. Sprinkle water
4.Highly made.
5. Creates wetland.
0 comments:
Post a Comment